Power Supply Requirements
GMDSS equipment is required to be powered from three sources of supply:- ship's normal alternators/generators;
- ship's emergency alternator/generator (if fitted); and
- a dedicated radio battery supply.
During Coast Guard inspections, the batteries must be able to go from 100% discharge to fully charged in no longer than 10 hours in order to pass certification. The charger to must be obtainable at all times during vessel operation and too should be inspected to make sure it functions properly. When the reserve source of energy consists of batteries, the battery capacity must be checked at intervals not exceeding 12 months. If not completed within past 12 months, this must be done during inspection.
Storage batteries provided as a reserve source of energy must be installed in accordance with applicable electrical codes and good engineering practice. They must be protected from adverse weather and physical damage. They must be readily accessible for maintenance and replacement.